Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 17 Next »

Date

Attendees

Goals

  • Discuss R&D projects.
    Discuss allocation and make issue tracker tasks for prototype work.
    Discuss milestones, deadlines.

  • Generate list of priorities for what we want our solution to achieve

Discussion items

TimeItemWhoNotes

Priorities (what problems are we solving?)All
    • Speed: speed is a feature. Predictably say how long some ingest will take.
    • Allowing recovery from failure; pick up where it left off.  Speed affects this; if it's fast enough you don't have to worry about it. Otherwise, make sure there's recovery. Harvesters should allow recovery, where possible. Indexers could also be less speedy than mappings and enrichments, and may deserve recovery features.
    • Adding automation that was originally specified: have a program that shepherds the process all the way through. Scheduling.
    • Eventually, provide a useable mapping DSL
      • Needs real market research
      • This is not a turnkey solution yet. Some things like DSLs will be evaluated later when we can more confident in understanding how big the user base is.
      • Writing mappings ourselves in the third system without a DSL will allow us to understand the problem space better.
    • Ability to debug things, especially mappings

Code examples

Michael et. al.

Got walkthroughs of the Python, Python + Spark, Java, and Scala prototypes


Scheduling systemAll

Scheduling / operation chaining / "Plans" in the Prov-O sense

  • Need metrics for what qualifies job failure. (Partly thought out)
  • Need to get together and assess our experiences running ingests.
  • If we automate things, we need to know how to define success.
  • Tools exist that can help with this.
  • Need to schedule a period after basic manual ingest running is figured out, but need to design for there being a scheduling facility.

Roadmapping all of thisAll


General consensus on the project's design philosophy is to follow these principles:

Action items

  •  
  • No labels